Sunday, November 29, 2015

Horisontal Stabilizer update

Since around November 7, 2015 I've been working on the first few pages of the Horizontal Stabilizer (Section 8).
I've made brackets, I've rearranged work tables wings and fuselage in our garage so we can walk by all that and I can still work.
I've deburred all edges and lightening holes on rear spar, and on the rear spar doubler. I've match drilled them and elevator hinges. Then I've deburred all holes.
Then I did the same for the front spar and doubler.
I've made the part on page 8-3.

I've pulled HS-1013, HS-1014, and HS-1015, cut them and deburred.
Then I've deburred all edges and lightening holes on front spar, and on the front spar doubler.
Past couple of days I've been match drilling spar caps, doubler, brackets and deburring all that.
Today, when I was almost done with page 8-5 where I countersunk nine holes in the flanges of the front spar, a leading tip of the countersink cutter broke and I've made a too deep hole. Let's see what Vans tell me about it (I've emailed them already).

 Here are the spars and spar caps. Kind of what I've done in the past weeks.

 Doubler, and brackets on the front spar.


And these are the hinges on the rear spar.


I expect to receive Prekote next Wednesday, so hopefully soon I will have time to prime all these parts.


I'm sitting in our airplane!!!

Last Saturday I got to sit in our RV-10!

Tuesday, November 10, 2015

Horisontal stabilizer begins

Last Sunday, I started HS by making forward spar brackets. To make sure I did things right I went to my friend Art Cole to do them. They seemed to turn out well.

Saturday, October 31, 2015

Rudder is completed

Finally, the rudder is complete. It only took me 6 months or so. Next thing to do is to show it to our EAA tech counselor to make sure he approves it. On to horizontal stabilizer!

Sunday, October 18, 2015

Rudder is nearing completion

I have done the trailing edge of the rudder. I was obsessing about it for several months, then I did it in afternoon.
I followed the plans, except for using mushroom set to finish off all the rivets. I was doing gradual backriveting on them and things looked well. When I tried to use mushroom set, the edge started deforming almost immediately. I stopped and continued with backriveting. 
I think it turned out well, except the small part where I used mushroom set, which is still OK.

Monday, September 28, 2015

Rudder is getting along

Dasha, mama,  grandma and me, we all took part in making progress on our rudder, which now is getting ready for trailing edge riveting.

Tuesday, September 22, 2015

Rudder work continues

In the past week and a half, somehow a state of normalcy is feeling stronger and stronger. Dasha is getting used to school, so things calming down.
After visiting Triple Tree Fly in, I've started working of rudder again.
I've primed all parts, riveted stiffeners to the skins, riveted bottom rib and horn, plate nuts. Almost every day I did a little bit, so that today I'm ready to start mixing Proseal to attach rudder edge and rivet it inside.
I managed to break my pop rivet puller today. Although I think I have fixed it, I've lost a retaining spring ring which holds the mechanism in the housing. Tomorrow will need to visit Lowes to get that ring.
When riveting bottom rib to right skin, I could not put a flush rivet in the aft hole. I mean, I could put the rivet in, but there was no way to squeeze it even using thin nose yoke... so I used pop rivet which is called on the left skin. I guess my rudder will have these pop rivets on both sides. 

Sunday, April 26, 2015

Rudder skins are dimpled

I dimpled rudder skins tonight. DRDT-2 works very well.
My mom dimpled a few holes too. This is getting to be a truly family airplane. 

1 hour 15 minutes today.

Saturday, April 25, 2015

More rudder work today

Today I have made a lot of progress.
I have match drilled all holes in the rudder, but then I ran out of cleco's again. Page 7/6 calls for drilling and clecoing every hole both in spar and in the trailing edge. I started with spar (after I match drilled all stiffeners and ribs). By the end I had maybe 15 clecos left. So I decided to keep clecos in every other hole in the spar. That had freed up quite a few of them.
Then I drilled and clecoed every hole in the trailing edge.
After that I have disassembled the rudder and deburred holes and everything else that was not. There was quite a lot of deburring, but it is done.
I then proceeded to dimple ribs and stiffeners.
Interesting, plans call for dimpling of bottom rib (R-1004A/B) and spar (R-1002). I used my pneumatic squeezer to dimple stiffeners with #40 (3/32) dies. Dimples look very nice. However, when I dimpled bottom rib, dimples did not look very pronounced. A rivet does not set flush in there. I decided to ask Vans - should the bottom rib and spar flanges be countersunk instead of dimpled? Let's see what they say.
Aside from skins and spar everything is now dimpled.
Not much to show, but here is the rudder after match drilling during disassembly.

Hours today 7:45.
Total hours on rudder 12:45
Total hours on build 82:45.

Sunday, April 19, 2015

Vertical stabilizer is completed

It is really done. Everything is now riveted.
Dasha said: "Какая классная штука" (What an awesome thing!)

My wife has helped to buck these rivets. What would I do without you?


Now, let's help dad with the next phase of the airplane.
Total hours on vertical stabilizer - 70
Total house on build - 70
This number of hours is approximate. Since my initial log was hacked and lost, I can only guess. I know it was slow, so let me make it 70 hours.

Saturday, April 18, 2015

Vertical stabilizer is almost finished

Today Galina and I have almost completed vertical stabilizer.
Honestly, I was extremely anxious about riveting the VS. After all, it took me almost one and a half years to overcome initial failure to set good rivets.
So today, sometime in the afternoon, Galina and I have bucked rivets on the middle nose rib! It certainly makes a whole lot of difference when two people work on the plane. Then we kept riveting and by evening our VS is almost done.
I just need to rivet bottom middle rib and then skin to the spar.

Friday, April 17, 2015

Rudder is assembled, well, almost.

Run out of clecoes!
Today I made a good progress on the rudder. I spent evening putting together all parts of the skeleton. Deburred everything I needed and could - stiffeners, skins. Then put everything together.
Interesting note - I did not pay attention to where bend is displayed in the drawings. There are two sets of parts - shear clips and stiffeners which are bend, but, of course, they are drawn flat. So when I marked and cut stiffeners, I marked "L" on my my left and "R" on my right.
When I was putting skeleton together, "L" should went on top of "R", but not in my case. I have the opposite - "R" goes on top of "L". This is not a big deal because parts are the same and I still did what the plans call for - the part on the left goes on top of the part on the right. Still, need to pay close attention to where the bend is. I'm suspect there are a few places in the build where this is very important.
Finally, I've run out of clecoes and had to stop. The rest of the clecoes are on the vertical stabilizer which I hope to start riveting skin on tomorrow.

Thursday, April 16, 2015

Rudder build continues

In the past couple of days I spent a few minutes here and there preparing and cutting stiffeners. 
Today I have deburred stiffeners, prepared bottom rip, rudder horn, match drilled and assembled what is seen in the picture.
Maybe spent an hour and a half.
Barney and Eva are visible through the lightening holes. :-)

Sunday, April 12, 2015

Rudder begins

Tonight I started cutting first rudder parts.
I have separated and deburred top rib, bottom rib, and shear clips.
This is easy part when one remembers how tools work.

Saturday, April 11, 2015

Vertical stabilizer is ready for riveting

This evening my wife and I have done WORK on VS!
My last note in the plans was made at this point of build on June 25, 2013, so it is a big deal that the work has been restarted.
We have riveted middle front rib to the inspar. I used 3 AN470D5-5 (5/32) rivets to fix by hack job when I drilled out damaged middle front rid.
Then we put skin on the frame and clecoed it.

Saturday, April 4, 2015

The revival

After almost two years I've picked up my tools and tried to do something about the airplane.
I final drilled new VS-1013, deburred it and shaped so that it will fit the VS. I almost went to rivet the whole thing, but realized that when I drilled out old one, I've made holes in inspar too large for designed rivets. 

I will wait for Vans answer about what size to drill and which rivets to use. Maybe I can drill two new holes of correct size, but that may lower the stength of the whole part... Better wait for Vans.

While waiting for answer I primed it too!

Vans said it was acceptable to use 5/32 rivets and drill #21. 

Monday, February 23, 2015

Sunday, February 15, 2015